For more than 25 years of operation we have completed over 500 projects – also consulting ones.

We built sewage treatment plants with daily capacity of over 100,000 m³, Sewage pumping stations with efficiency of over 25,000 m³/h, objects requiring specialist engineering knowledge and excellent management of the investment realisation phase. It is worth emphasising that some of them were executed abroad.

SELECTED REFERENCE

Modernisation of the Main Sewage Pumping Stations No. 6B and 7A / Odessa, Ukraine

6B = 15 120 m³/h, 7А = 10 080 m³/h

Ordering Party: Regional Development Agency

Execution period: 2012-2015

Value of works:approx. USD 14.5 million

Scope of performed works included e.g.:

  • construction and assembly/installation works of pumping station together with a system of pipelines of stainless steel with diameters of Dn 1200,
  • delivery and assembly/installation of e.g. pump units, fittings with large diameters of up to Dn 1800, grating, flowmeters, anti-fluid hammer system,
  • construction of 3 km of pipeline with diameter of DN 1200 – DN 1800.

Modernisation of municipal sewage treatment plant / Ivano-Frankivsk, Ukraine

Q=90 000 m³/d

Ordering Party:Ivano-Frankivskvodoekotekhprom Utility

Execution period: 2012-2014

Scope of performed works included e.g.:

  • construction works on modernised of objects, construction of new objects e.g. grit chamber,
  • delivery and assembly/installation of technological equipment e.g. grating, pumps, stirrers, scrapers, aeration system and automation system,
  • start-up of object and training for user’s staff.

Delivery and assembly/installation for 24 sewage pumping stations and 5 pump units for the main pumping station of the city of Kharkiv / Kharkiv, Ukraine

Pumps for 24 sewage pumping stations and 5 pump units

Ordering Party:Municipal Company “Charkivvodokanal”

Execution period: 2011-2013

Scope of performed works included e.g.:

  • construction and assembly/installation works concerning technological networks and equipment,
  • mechanical and hydraulic start-up of equipment within the scope of modernisation of urban sewage pumping stations.

Reconstruction of sewage treatment plants in Andrychów / Andrychów, Poland

Q = 13.275 m³/d

Ordering Party:Zakład Wodociągów i Kanalizacji Spółka z o.o.

[Water Supply and Sewage System Plant, Limited Liability Company]

Execution period: 2013-06.2015

Scope of performed works included e.g.:

  • technological installations,
  • disassembly of existing equipment,
  • assembly/installation of devices and technological equipment in mechanical, biological, sedimentary and biogas parts of sewage treatment plant.

Extension and modernisation of sewage treatment plant / Goleniów, Poland

Q = 8.190 m³/d

Ordering Party:Goleniowskie Wodociągi i Kanalizacja Sp. z o.o. [Goleniów Water Supply and Sewage Systems, Limited Liability Company]

Execution period: 2009-2012

Scope of performed works included e.g.:

  • construction works,
  • delivery and assembly/installation of devices and technological equipment,
  • installation and networking works, electrical works, Control and Measurement and Automation Apparatuses and for objects in mechanical, biological and sedimentary parts of treatment plant,
  • start-up of entire sewage treatment plant.

Extension of sewage treatment plant / Słupsk, Poland

Q = 28.200 m³/d

Ordering Party:Wodociągi Słupsk Sp. z o.o.

[Słupsk Water Supply Systems, Limited Liability Company]

Execution period: 2006-2008

Scope of performed works included e.g.:

  • construction works,
  • technological works together with delivery and assembly/installation of devices and technological equipment,
  • installation and networking works,
  • electrical works and Control and Measurement and Automation Apparatuses in mechanical and sedimentary parts of treatment plant.